DESIGN PREVIEW · Working title · Not yet an operating housebuilding service
HEMP / HOMES
Contact us today to discuss your hempcrete projectPreview: prepare and download your brief. Live contact delivery is not connected.

PRACTICAL PROJECT GUIDE

Choose finishes with the wall

A beautiful surface has a technical job.

Your next useful step

A beautiful surface has a technical job.

Start with compatibility

Ask the system designer which internal and external finishes are compatible with the intended moisture behaviour and exposure. A finish is part of the assembly, not a decoration-only decision.

What research shows

University of Bath experiments found moisture-buffering performance changed with wall linings and paints. Tested synthetic trade paint reduced buffering in those assemblies; this does not establish the performance of every paint or finished wall.

Prepare a sample specification

Record the substrate, preparation, primer if required, finish coats and manufacturer guidance. Ask for a sample panel to review colour and texture before committing.

Keep the water strategy intact

The choice of a vapour-open finish does not remove the need for sound roof, base and opening details or a ventilation strategy.

Sources & further reading

Bath · Moisture-buffer potential of experimental assemblies

Choose another project guide

FROM CURIOSITY TO A CLEARER BRIEF

What could your home become?

Five simple questions. A useful starting point, not a technical specification.

Find your starting point
Build your project brief Prepare supplier questions Explore independent suppliers